Labour Control In Building Industry
CHAPTER ONE -- [Total Page(s) 2]
Page 1 of 2
-
-
-
CHAPTER ONE
INTRODUCTION
1.1BACKGROUND OF THE STUDY
Labour
control in building is one of the several option of procurement used for
project delivery process and records shows that is the oldest
procurement system and has been in use in Nigeria far back as the
colonial era. It is very important in most of the countries and
researchers described it as a system whereby a developer plans and
organizes the project delivery process, carries out the design, the
planning and procurement of resources and the construction a project
using client employed supervisory staff and labour. This type of system
is regarded as in-house because clients staff as different from
contactor’s staffs carry out the project delivery process and
activities. Labour control is the good development in construction
because it does not result in high staff strength and overhead costs in
the Nigerian construction industry.
The term procurement system
refers to a project execution and delivery process and it describes the
responsibilities and contractual obligation of the parties to carry out
the numerous activities involved in delivering to the owners. According
to Ojo (2009), procurement involves the various combination of the
design and construction phase to achieve the form of organization to
implement the project. Maizon (2003), mention that the Selection of a
procurement method for a given project is a difficult task for the
clients due to the various factors governing a construction project. He
stated further that different client have differing needs and
requirements whereby construction project vary so considerably and in
every respect, that no single method of procurement can be suitable for
every project.
Construction projects are very essential especially as
see in developed countries where project are taken as a great priority
because it is part of the determinant in knowing the level of
development of any country. It evolves through the stages of conception,
design and the actual construction. A potential owner initiates the
conceptual process by making dew is needs and requirements in form of a
brief to a professional. At the design stage, the relevant professionals
translate the primary concept into three, an expression of a spatial
form to satisfy the owner’s requirements in an option and economic
manner. At the construction stage the conception and design are
actualized in a practical terms to satisfy the brief.
CHAPTER ONE -- [Total Page(s) 2]
Page 1 of 2
-
-
ABSRACT - [ Total Page(s): 1 ]The project research labour control in Building industry is concern about the problem that is associated in construction industry Lagos during the time of working, such as redundancy, interaction, fighting each other in the field of construction, and again to minimize waste of much time in working hour and monitoring how the project is moving with the help of supervising them and motivating the labourers until a project is completed. In this discussion, we emphasize, the work schedule that is ... Continue reading---