Labour Control In Building Industry
CHAPTER ONE -- [Total Page(s) 2]
Page 2 of 2
-
-
-
1.2STATEMENT OF THE PROBLEM
Method
provides the framework for implementation and development of project.
Time and serious attention are devoted towards the establishment of a
procurement system that will be suitable for a particular project. A
method used in Building for a particular project is expected to achieve
the objective of the project in terms of cost, time and quality but this
has not been the case.
Time and cost overrun have been a major
problem confronting the Nigerian construction industry and all attempts
that have been made so far have not been able to yield the expected
results problems have been established from various research work that
have been carried out in the past as result of the use of labour control
in execution of construction projects includes high staff strength time
and cost overrun, poor quality delivery etc.
Labour control and
other method adopted in Nigerian Building Construction Industry have
raises serious concern to the project stakeholders and the construction
industry as a whole. The purpose of the study is to investigate labour
control in Building Industry in Lagos state and it environs.
1.3AIMS AND OBJECTIVES OF THE STUDY
The aim of this project to investigate the labour control in Building and how it affects the project delivery process.
The objective of the study include the following:
1) To find out factors that result into the labour control in Building industry.
2) To minimize waste in Nigerian Building Industry through effective management control.
3)
To make recommendation based on the findings in the project on how
labour can be properly managed and utilized on site.
4) Call for employing skilled works for supervision and general site planning and control.
CHAPTER ONE -- [Total Page(s) 2]
Page 2 of 2
-
-
ABSRACT - [ Total Page(s): 1 ]The project research labour control in Building industry is concern about the problem that is associated in construction industry Lagos during the time of working, such as redundancy, interaction, fighting each other in the field of construction, and again to minimize waste of much time in working hour and monitoring how the project is moving with the help of supervising them and motivating the labourers until a project is completed. In this discussion, we emphasize, the work schedule that is ... Continue reading---