-
Investigation Into Ascertain The Causes Of Failure And Present Traffic Capacity Of Highways
CHAPTER ONE -- [Total Page(s) 2]
Page 2 of 2
-
-
-
1.1 AIMS AND OBJECTIVE OF STUDY
The
major objective of this investigation is to ascertain factors that
likely lead to the failure of Eliozu-New Airport road in Obio/Akpor
L.G.A. of River State in particular and Nigeria Highways in general and
how it affect national stability and development. This project work
stand at a point to unveil the very facts behind why most of the roads
fail soon after construction.
The count carryout will broadly provide
information on the actual traffic volume and the capacity of traffic
and will help in used for possible traffic planning and design.
It
shall lead in proper construction of highway and remedy that will
possible give a lasting solution and reduction in road failures. The
several test such as test on asphalt, test on soil will provided better
facts to the cause of the failure of the case study.
1.2 SCOPE OF THE PROJECT STUDY
The whole section of the road was visited (Reconnaissance) and failure pattern noted.
The project scope includes:
- Assessment of kind of failure and causes on the Eliozu-New Airport road.
- Soil samples collection and testing and analysis to determine the sub-grade, sub-base strength of the road foundation.
- Assessment of underground water level and its affect on the pavement.
- Assessment of traffic capacity intensity on the networking plan of the road and volume determination.
- Assessment of drainage condition and proper drainage provision.
- Assessment of the proportion and amount of bitumen and finer used in the Asphalt mixture used for the surface course.
- Classification of the soil according to ASSHATO classification system.
- Enumeration of possible pavement distresses that are found along a road section.
1.3 BACKGROUND INFORMATION OF THE STUDY AREA
The
location of which this investigation is been carryout is a road network
located at Obio/Akpor L.G.A at the out script of Port-Harcourt, River
State. The road is from Eliozu junction to Airport road leading to Elele
of which concentration is lay on the Eliozu junction where ABC shuttle
is, at where over head bridge is undergoing construction currently to
where the Eliozu-New airport road intersect with the airport road.
1.4 LIMITATION OF THE STUDY
This
research was carried out under the limits of the available material and
resources. The work is centre on soil sample testing and
classification, asphalt testing and traffic volume and effect of
groundwater on road bases.
The following factors hinder the prompt attainment of this project work.
- Lack of laboratory facilities
- Cost of the project work
- Time proximities.
CHAPTER ONE -- [Total Page(s) 2]
Page 2 of 2
-
-
ABSRACT - [ Total Page(s): 1 ]The essence of this project work is to look into the causes of highway failure and the different types of failure which are presented along the Eliozu - New Airport road in Obio/Akpor L.G.A in River state, taken as a case study. Some factors identify as being responsible for the failure of the chosen road section includes, poor sub grade soil with questionable material. Ground water study is carried out, which give insight to it effect to the failure of the flexible pavement, lack of drainage fa ... Continue reading---