1.4 ADVANTAGES OF A ROAD TRANSPORTATION
Road is pre-requisite to speed and speed is essential or progress .it is different enumerate all the advantages of roads.
Main advantages of roads
1. Road facilitate the movement of men and materials from one place to another.
2. Educational contact can be maintained, with the help of good roads
3. Resources of an area are easily tapped and o\improved with the help pf goal network of roads
1. The are essential for the economic prosperity and general development.
2.
Road provides a key element of the infrastructure whose function growth
usually condensates in areas where transport fatalities are good.
1.4 RECONNAISSANCE SURVEY
Reconnaissance
survey gives an insight on the nature of work required. It is a rapid
examination of the ground and its adjacent natural features so as to
obtain maximum information on the physical condition of the site. it is
usually done without instrument to limit the alternative route in terms
of constant energy.
1.4.1 CHAIN SURVEY CLINEAR MEASUREMENT
This
method employs the use of tape-band for measurement. Linear measurement
and it largely depends on the required accuracy. High accuracy may not
be achieved.
1.4.2 STATION MARKING
REASONS FOR STATION MARKING
1. To avoid human traffic interference
2. Easy location traffic points for quick survey
3.
The point were fixed on a firmly permanent way so that they can be
available for letter use, nails were driven to bottle corks which was
used to identify chainages.
CHAPTER ONE -- [Total Page(s) 3]
Page 3 of 3
-
-
ABSRACT - [ Total Page(s): 1 ]The study cover a view and a detailed explanation of the modification required to be carried out on the main access road linkage of the Campus III Industrial center from federal Secretariat to Mass Communication Department of the Institution in order to update its services and functions.The need for easing the flow of traffic on this access road shall rise, since it s a commercial center in the institution. It is required that the toad be revamped and generally upgraded. The existing road is no ... Continue reading---