-
Determination Of Headway And Average Travel Speed Of Vehicles
[Case study of post office-Kwara State Polytechnic permanent Site Car park Road] -
-
-
3.4 EXPLANATION ON HEADWAY
Day 1 practical
The headway between LEM.806XA and SHA-603SA is 1minute
The headway between Sha-603SA and AH.167-AFN is 4minutes
The headway between AH.167-AFN and AK.309-LRN is 4minuites
The headway between AK 309-LRN and PD557-AAA is 5minutes
The total average headway for the day 1 practical is=
(1+4+4+5)/4=3.5
Day 2 Practical
The headway between AQ309-LRN and TW729-KJA is 1minute
The headway between TW729-KJA and MUN881-AA is 1minute
The headway between MUN 881-AA and HF832-PHC is 9minutes
The headway between HF832-PHC and BDU177 AA is 7 minutes
The total average headway for the day 2 practical is=
(1+1+9+7)/4=4.5
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTSince it is compulsory that people and goods move from one part of the country to the other or within particular defined regional area, the facilities used for this purpose need to be well planned, designed and constructed. Inadequate and unplanned traffic control constitute a lot of problems resulting in delay, congestion, immobility to uneasy access to transport etc. This project is to determine the headway and average travel speed of vehicles (Case study of post office- Kwara State Po ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTSince it is compulsory that people and goods move from one part of the country to the other or within particular defined regional area, the facilities used for this purpose need to be well planned, designed and constructed. Inadequate and unplanned traffic control constitute a lot of problems resulting in delay, congestion, immobility to uneasy access to transport etc. This project is to determine the headway and average travel speed of vehicles (Case study of post office- Kwara State Po ... Continue reading---