    • 1.1    HISTORICAL BACKGROUND OF GROUTING
      The development and history of compaction grouting over the last 30-40 years as been established by many distinguished researcher, design engineer and design contractor. Many technical papers are been published dealing physically with the issues surround compaction grouting design such as: “compaction grouting, 1973”, “planning and performing compaction grouting” 1974. These and other important reference are the main stream basis of knowledge for the highly specialize engineering and construction technique know as compaction grouting. The compaction grout method as some unique features which allow distinct advantages over other remedial method of geo-technical construction. In many distances growth is the only viable solution. Some of the advantages include: Economic: Many time compaction grouting is the only feasible solution to foundation settlement problems, other than demolishing the structure and re-building with expensive deep foundation technique. Minimal disturbance: During the grouting operation, destructure may remain occupied and in service. Minimal risk: Compaction grouting offers minimal risk of catastrophic structural failure while re-leveling structure. Other are: Minimal geotechnical exploration, provide greater support for structures, cost factor e.t.c.   
      1.2   AIM AND OBJECTIVE
      1.     To determine the nature of the sandy soil particles.
      2.     To determine the degree of the sandy soil compatibility.
      3.     To carry out the improvement of sandy soil through grouting.
      4.     To carryout some laboratory test on sandy soil such as compaction test California bearing ration (CBR) test, atterberg LIMIT test, liquid limit test, Plastic limit test, sieve analysis test in comparing the effectiveness of grouting system.   
      1.3            SCOPE OF THE STUDY This research is focused on the quality and improvement of bearing capacity of sandy soil by grouting.   
      1.4            LIMITATIONS OF THE STUDY The limitations of this study are:
      TIME FACTOR: Limited time that does not permit to carryout many practical.
      AREA OF STUDY: This project is limited the technical study of sandy soil properties.