• Investigation Into Level Of Services
    [A CASE STUDY OF EGBEJILA ROAD]

  • QUESTIONNAIRE -- [Total Page(s) 1]

    Page 1 of 1

    • QUESTIONNAIRE FOR INVESTIGATION TRAFFIC LEVEL OF SERVICE (CASE STUDY OF EGBEJILA ROAD ILORIN KWARA STATE) IMPROVEMENT OPTIONS
      FOR
      STUDENT PROJECT, IN THE DEPARTMENT OF CIVIL ENGINEERING INSTITUTE OF TECHNOLOGY (IOT), KWARA STATE POLYTECHNICS ILORIN
          This questionnaire is designed to collect information for stake holder in Egbejila community area. The information received is for the purpose of the study and it will be treated as confidential
          We appeal to please supply the information as accurately as you can
      Respondent name:_________________________
      Sex:____________________________________
      Occupation:_____________________________
      Resident:_______________________________
      Age:_______________ (a)0-20 (b) 40-45 (c) 50-60 (d) above 60
      How long have you been driving in this area (a) 0-15 years (b) 6-10 years (c) 11-15 years (d)above 15 years
      What are the major problems of road (a) potholes (b) edge broke
      What type of road surface will you recommend in the area (a) Asphaltic concrete (b) surface dress (c) Gravel and Earth road (d) Others specify During which season of the years does the road expense failure (a) Raining Season (b) Dry season (c) Both Raining and Dry season (d) none
      Who is responsive for road maintained of the road (a) federal government (b) state government (c) local government (d) community
      How do you classify the volume of traffic (a)0-5 vehicle per day (b) 50-100 vehicle per day (c) 100-200 (d) above 200 per day
      What type of vehicle fly the road (a) car (b) Buses (c) Tippers (d) Trailers
      How comfortable are you when passing through the road  (a) very comfortable (b) slightly comfortable (c) not comfortable (d) very uncomfortable
      What is the rate of road accident (a) low 1-5 per month (b) medium 6-10 per month (c) above 10 per month (d) non
      What is your opinion if the cause of the road failure in the area
      ___________________________________     
      What are the effect of the bad road______________________________
      What are your suggestion for improvement ______________________

  • QUESTIONNAIRE -- [Total Page(s) 1]

    Page 1 of 1

    • ABSRACT - [ Total Page(s): 1 ]ABSTRACTThis project was executed in order to investigate into level of service of Egbejila Road Ilorin west Local Government Kwara State and improvement options.     It was carried out to determine the rigidity quality, traffic characteristics and traffic volume study of the road, which was put into consideration in order to know what really cause the failure and how to determine the improvement option for such road. It was also discussed; some of the possible effect of contraction which lea ... Continue reading---

         

      LIST OF TABLES - [ Total Page(s): 1 ]LIST OF TABLES        Table 3.3.1    Inventory of Road Defect along Egbejila Road in Ilorin West Local government Area of Kwara state Table 3.3.1a    Traffic Volume Study on 18-04-2016 1st week Table 3.3.2b    Traffic Volume Study on 20-04-2016     Table 3.3.3c    Traffic Volume Study on 23-04-2016 Table 3.3.1b    Traffic Volume Study on 27-04-2016 2nd week Table 3.3.2b    Traffic Volume Study on 29-04-2016 Table 3.3.3c    Traffic Volume Study on 30-04-2016  Table ... Continue reading---

         

      LIST OF PLATES - [ Total Page(s): 1 ]LIST OF PLATEMain entrance of Egbejila road   Potholes along the Road Chainage 0+200  Road damage Chainage 20+400  Potholes along the Road Chainage 39+500  Michael on Traffic Volume Study  ... Continue reading---

         

      TABLE OF CONTENTS - [ Total Page(s): 1 ]TABLE OF CONTENTContent  Title page   Certification Dedication       Acknowledgement    Abstract  Table of contents List of Table List of Pates  CHAPTER ONE     1.0    Introduction  1.1    Statement of the Problem 1.2    Aim and Objectives of the Research  1.3    Justification 1.4    Scope of the Study  1.5    Description of the Study  1.6    Methodology   CHAPTER TWO2.0    Literatures Review   2.1.0    Classification of Road  2.1.1    Class ... Continue reading---

         

      CHAPTER ONE - [ Total Page(s): 2 ]In addition, it is essential to establish a technique that may be useful for determine relative accessibility of location in the road network. Ever when relative advantage are determined, there is need to develop models that will be useful for predicting commercial property values in Nigeria.1.4    SCOPE OF THE STUDYRoad may be classified as international, intercity or intra-city. International and inter-city road are usually major or arterial road, while intra-city road are routes within a c ... Continue reading---

         

      CHAPTER TWO - [ Total Page(s): 5 ]CHAPTER TWO2.0    LITERATURE REVIEW Road as a means of transportation is by far the most widely used form of transportation in various development program have been prepared on the basis of some official guild line  or principle rural roads transport development. The main objectives of this initial phase of road development are to establish specific goals and prescription for road network development along with the more general location needs.    The socio-economic growth of any state or ... Continue reading---

         

      CHAPTER THREE - [ Total Page(s): 9 ]CHAPTER THREE3.0     DATA COLLECTION3.1     INTRODUCTION    The importance of collection data on the pavement and sub-structure on which it is built is to assess the type, classification, characteristic of traffic and to know the nature of surfacing of the Oloje road in order to obtain useful information with respect to the Engineering properties of materials used in its (Pavement) construction and the maintenance need of suck area.3.2     THE STUDY AREAThe study area is located at ... Continue reading---

         

      CHAPTER FOUR - [ Total Page(s): 6 ]CHAPTER FOUR4.0    ANALYSIS AND DISCUSSION    Based on the information obtained from the condition survey and questionnaire method of data collection the following analysis and discussion are made.4.1    ANALYSIS OF THE QUESTIONNAIREA       major problem of the roads:70% of the respondent agreed that pothole is the major problem on the roads6.6% of the respondent agreed that drainage is the problem on the roadB    TYPE OF ROAD SURFACE DESIRED:93.4% of the respondent agreed that ... Continue reading---

         

      CHAPTER FIVE - [ Total Page(s): 1 ]CHAPTER FIVE5.0    CONCLUSION AND RECOMMENDATION5.1    CONCLUSION    In conclusion, base on the fact collected from conditional survey and questionnaire method seen distribution to the various organization bodies, the drivers and Elite people in Egbejila Community Area. The road failed due to lack of drainage and the bad formation of the soil, which as not be construct before, the road normally affect the mode of transportation during the raining season which lead to the low traffic per ... Continue reading---

         

      REFRENCES - [ Total Page(s): 1 ]REFERENCEADB (2002), selected statistic on African countries.Adeniji. N. (2002), “transport challenges in Nigeria in the next two decades” keynote Address delivered at the 5th National council on transportation.Adeoti N.A (2008), lecture notes on transportation Engineering Department of civil Engineering, Institute of technology kwara state.Ahmed R and M Hussein (1990), Development impact of rural infracstructure in Bangladesh.Washinton DC. IFPRI.Burningham.S. and N. stanveich. (2005 ... Continue reading---