    • CHAPTER FOUR
      4.1    DESIGN SYNTHESIS /ANALYSIS
      DESIGN CRITERIA: the design objectives are obtained as follows.
      -    To meet up the demand of a primary health centre
      -    To enhance the function relationship of various unit
      -    To avoid direct Penetration of sun rays, especially into ward and     where people stay long
      -    To achieve natural lighting and ventilation where necessary
      -    To let the users movements with in the centre to be as self     directional     as possible
      -    To achieve enough comfort ability for staff and patient.
      4.2    THE DESIGN FORM
      -    To let the centre confirm with the pattern and treatment of the     structure being erected at the community for familiarity.
      -    To allow for expansion, especially in the numbers of wards.
      4.3    AESTHETICS
          To let the centre not to look odd, and also the surrounding should be pointed is a colour that will sint the health centre such colours are whit, cream colour, Brown colour, sky blue colour etc.
      4.4    DESIGN CONTROL
          From the metrological data given, the prevailing climatic conditions do not present any adverse condition with regard to the planning and designing of the proposed health centre, thus the design will be stated.
      4.5    CONCEPTUAL DEVELOPMENT
          One guiding design concept is directed two wards the segregation of the major zones of the health centre which are the out-patient department supporting facility unit, the maternity wing, the emergency and administrative we units.
          Therefore aim image representation of letter A is being used at the health department units.


  • CHAPTER FOUR -- [Total Page(s) 3]

    Page 1 of 3

    1 2 3    Next
    • ABSRACT - [ Total Page(s): 1 ]ABSTRACT WILL BE HERE SOON ... Continue reading---

         

      CHAPTER ONE - [ Total Page(s): 4 ]OUTPATIENT DEPARTMENT1.    Treatment room2.    Injection room3.    Laboratory and store4.    ConvenienceINPATIENT DEPARTMENT1.    Male ward2.    Female ward3.    Emergency drop –off4.    Ambulance bayDESIGN SCOPE-    Admin section-    Immunization, family planning and Delivery Section-    In patient-    Out patient1.6    LIMITATION OF STUDY    The proposed project is limited to only one main building, mosque, mini mart, eatery, pharmacy.1.7    ... Continue reading---

         

      CHAPTER TWO - [ Total Page(s): 2 ]DEMERIT1.    The waste pipe is not buried and can cause environmental     population     when break.2.    Not well landscaped.2.4    CASE STUDY THREE    Odo-Owa Ilofa health care is located in between Odo-Owa and Ilofa in Oke-ero government of Kwara State.MERIT.1.    It is aesthetic2.    It is well ventilated3.    It is accessible and function wellDEMERIT1.    Not easily accessible2.    The drugs and injection are not much in the pharmacy3.    Absence of ramp ... Continue reading---

         

      CHAPTER THREE - [ Total Page(s): 2 ]CHAPTER THREE3.0    INTRODUCTION OF STUDY AREA /SITE SELECTION    The overall success and efficiently of any community amenity like the primary health centre depends not only on a careful choice of gift. The orientation of the site includes the relationships of the site to its immediate neighbouring environment. The site is suitable oriented to its immediate vicinity by making sure that its located in a considerably accessed area to the fastest point that need is services.3.1    SITE LO ... Continue reading---

         

      CHAPTER FIVE - [ Total Page(s): 2 ]CHAPTER FIVE5.0 CONSTRUCTION METHODOLOGY AND MATERIAL     STANDARD FORMSA  INTERIOR WALL     All the construction will be simple rein forced concrete frame with columns, beam and slabs where necessary. The extend walls and internal walls will be of 225mm solid block plaster and finished with milk fish white emulsion plant inside while the external will be off white to control neatness. Through this paint generate health, especially during hot weather this problem is solid through the numb ... Continue reading---

         

      REFRENCES - [ Total Page(s): 1 ]REFERENCESBARRY R. (2012) Building Construct Volume i,ii,iii,iv.CHUDLEY R. (2016) Construction Technology Volume 1-4 Second     Editions.DE-CHIARA (2004) Architectural Site PlanningDE CHIARA AND JOHN CALENDAR (2011) Time Saver Standard for     building type.FRASUAR REIKE (2007) Draughtsman ship Architectural and     building graphic.FULLETATON R.L (2010)Building Construction in warm ClimaticGEORGE K. STEGMAN AND HARY Y. STEGMAN (2009)     Architectural drafting. Functional Planning a ... Continue reading---