• Design And Construction Of Automatic Change-over For Three Phases

  • CHAPTER ONE -- [Total Page(s) 1]

    Page 1 of 1

    • CHAPTER ONE
      1.1    INTRODUCTION
          Power instability in developing countries creates a need for automation of electrical power generation or alternative sources of power to back-up the utility supply. This automation is requiring as the rate of power outages become predominantly high. Research in the field of electrical electronics engineering has led to the tremendous discovers and inventions especially in the area of automation and power control. These invention have been useful in solving the over-in.
          Creating problem posed by power generation, distribution and control, which has been a cause of concern especially in the third world countries (developing countries) like Nigeria. Most industrial and commercial process is dependents on electric power and if process of a change-over is manual, serious time is not only wasted but it creates room for human error (in the area of change over connections) which could result in great economic loss.
          This project is all about the construction of an automatic generator change-over panel with timer which aids in the switching over to alternation power supply authority i.e. Power Holding Company of Nigeria (PHCN) popularly known as NEPA which is the main power regulating body in Nigeria. This project consist of circuit breakers, electromagnetic contactor which carry heavy load current relay which work with the principle of electromagnetic induction  because it will receive electrical signal to trigger and neumatic timer all incorporated and interconnected to achieve the desire goal.
          Also this project is constructed in such a way that provision is made for manually operation (it can be operated manually) when necessary for required for example, in the situation whereby voltage supplied by the authority (PHCN) is fluctuating and one may decided not to use it, so the constructed automatic change-over panel can be permanently switch to generator set temporarily pending the time that utility supply is stable moreover in the hospital where where surgery operations is needed to be carry out and power outage for even five second cause damages, one may decide to neglect the supply from authority (PHCN) and permanently switch the panel to manual operation pending the time or period by which surgery operation is completed. During the pending period this change-over will be working continuously in manual operation. Fill someone or the operation has to switch over to automatic operation. As said earlier, provision is made for these types of generation in this project and there is separate switch that performed the function.
      1.2    AIM AND OBJECTIVE OF THE PROJECT
          The aim of the project is to design and construction automatic change-over switch load from the mains power supply (PHCN) to a backup power supply (Generator) with simplicity.
          The advantages of this project cannot be over emphasized, since outage is a major problem is the advent developing nations like Nigeria, for example, power failure of minute in an airport terminal can create losses that could run into millions of dollars due to loss in air traffic system control the ability for back-up to start and change-over automatically becomes imperative under such circumstances.
          Also, this project could play a large role in the security in banks and companies i.e. an outage of up to ten minute in an organized setup is enough to do all the damage required with such an automatic change-over device in place the generator backup would no longer have to depend on security men and of course reduced fear of system breakdown in the companies there by ensuring smooth running of economics activities.
      1.3     SCOPE OF THE PROJECT        
          Basically, this project is a three phase automatic change-over device with the power capacity of 50KVA. Generator as deducted from my calculations it shows that generator of power rating ranging from 0.5KVA to 50KVA is required to be use for this project though the contacts of electromagnetic contactor relays and circuit breakers. Also the maximum load current should be between the ratings of 10A to 90A load current. Therefore the use of 10Amperes in this project is because of future extension.
  • CHAPTER ONE -- [Total Page(s) 1]

    Page 1 of 1

    • ABSRACT - [ Total Page(s): 1 ]ABSTRACT    The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage.    Power instability or outage in general does not promote development in the public and private sector. The inventors do not feel secure to come into a country with constant or freq ... Continue reading---

         

      APPENDIX A - [ Total Page(s): 1 ]BILL OF ENGENEERING MEARSUREMENT AND EVALUTION (BEME)The table below shows the cost estimate in naira and kobo of constructed automatic change-over panel.Bill of Engineering Measurement and Evaluation ... Continue reading---

         

      TABLE OF CONTENTS - [ Total Page(s): 1 ]TABLE OF CONTENTS Title Page   Certification   Acknowledgements  Abstract   Table of Contents   CHAPTER ONE1.1    Introduction  1.2    Aim and Objective of the Project  1.3    Scope of the Project CHAPTER TWO2.1    Literature Review  2.2    Manual Change-over Switch  2.3    Automatic Change-over Switch  2.4    Related Work 2.5    Reasons for Automatic Change-over Switch  2.6    Problems of Automatic Change-over Switch  CHAPTER THREE3.1    Methodolog ... Continue reading---

         

      CHAPTER TWO - [ Total Page(s): 4 ]The circuit diagram of the flip flop and switching transistor stage of the related art.Another related art was the development of a single phase automatic change-over switch. This also related to the present invention i.e. it switches electrical power supply from public supply to generator in the event of a power outage or insufficient voltage but it is apply to single phase system while the present invention is apply to three (3) phase system, moreover, the system uses an electronic control cir ... Continue reading---

         

      CHAPTER THREE - [ Total Page(s): 4 ]START AND STOP BUTTONS     These two push buttons are used to close and open the circuit respectively. The start push button is a normally open type (NO) while the stop push button is a normally close (NO) type to breaker the circuit when need arise3.5     CONTACTOR    Is a device designed for repeatedly making and breaking an electronic power circuit. It is usually operated magnetically. It can be operated in line or be remotely governed by pilot devices or relay. And when there is a s ... Continue reading---

         

      CHAPTER FOUR - [ Total Page(s): 4 ]CHAPTER FOURCONSTRUCTION4.1    LIST OF COMPONENT USEDThe following electronic components used in the project are list below(1)    Voltmeter (2)    Casing (3)    Vero-Board(4)    Transformers DC 12V(5)    Diodes (6)    Capacitors 100(7)    Resistors 4k(8)    Contactors (9)    16mm2 Cables(10)    1ooAmp connector (11)    Bolt and Nuts(12)    Indictor light (13)    Relay three phase (14)    555IC timer 4.2    VERO BOARD: is a brand of strip-board, a p ... Continue reading---

         

      CHAPTER FIVE - [ Total Page(s): 1 ]CHAPTER FIVE5.1     CONCLUSION    The automatic change-over switch has immense advantage in every area where power is required it is a fact that there is hardly any aspect of human life were electrical power is not required, at home, offices, hospital, etc.    It find a wide application scope, wherever the re-ability of electrical supply is necessary, for switching to an alternative source from main.5.2     RECOMMENDATIONThe automatic change-over switch is needed in every home and of ... Continue reading---

         

      REFRENCES - [ Total Page(s): 1 ]REFERENCEB.L. and A.K. Theraja (1997): Electrical Technology, S. chand company LTDEngr. A.O Aduloju (2003): Electrical Power System, Evidence Nigeria VentureEngr. M.B Jenyo (2007): Electrical Power System III & IV lecture Notes, UnpublishedEngr. T.A. Mustapha (2006): Electrical Power System I & II inn lecture Notes, unpublishedInternet Research: http://www.electricalsolution.comM.S. Ahmed, A.S. Mohammed & C.B. Augusibo (2006): Development of a single Automatic change-over switch Federal Universi ... Continue reading---