• DESIGN AND CONSTRUCTION OF AN AUTOMATIC CHANGE-OVER SWITCH WITH GENERATOR CUT OFF AND STARTER


  • You can get the complete material / full content @ a service support fee of ₦4,800.00(10-USDT) only

    Download This Material Now !!

    • ABSRACT - [ Total Page(s): 1 ]Power supply in Nigeria and most developing countries of the world is anything but stable. This has adverse effects on the consumers of the electricity and the equipments that are operated from the mains sources of electricity supply in these parts of the world. Automatic change over switch system is used to ensure continuous supply to load in case the mains supply is not healthy or disconnected. This project designs and constructs of an automatic change over switch with generator starter and cut-off. In this paper, we provide an automatic switching mechanism that transfers the consumer loads ... Continue Reading

         

      CHAPTER ONE - [ Total Page(s): 2 ]CHAPTER ONEINTRODUCTION1.1 Background of the StudyPublic power supply is a major contributor to economic development in every nation. In developing nations like Nigeria, Ghana, Cote d’Ivoire and under developed parts of the world, the public power supply for industrial, commercial and domestic use is highly unstable (Peter, 2002). This has negative effect on the economy in such that most of them had to depend on frequent use of alternative power sources such as generator, inverter, solar to meet up with the energy demands. One of the common alternate sources depended on ... Continue Reading