    • Furthermore, if the President of the country is making a nation wide broadcast and all of a sudden there is power failure in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must go for it.
                Sequel to the rate at which more sophisticated electrical/electronics gadgets are being procured an installed in our homes, hospital and business premises, there is a justifiable need for a faster and more reliable change over system in an event of power outage.
                In view of these considerations, this project is aimed at designing and constructing a workable automatic change-over switch with phase selector circuit which switches on the load from National Electric Power Authority (NEPA) to a generator when power comes back. Also when there is a phase failure in any of the NEPA phase carrying the load, the change-over switch will be changed to alternative phase.
      1.3     SCOPE AND LIMITATION OF THE STUDY
      The automatic change over switch is aimed to achieve the following automatic actions.
      To start the generator
      To change power to generator                                           
      To change back to NEPA
      To change the generator
      To change to alternative phase in case of phase failure.
      The automatic change over unit can be operated in single or three phase-system. The automatic change over switch has the following advantages.
      i.        It minimizes damage to lives/equipment since it has its own monitoring system and its switching requires no human contact with the switch, thus eliminating human error.
      ii.       It reduces its change-over timing to the minimum due to its fast response to power outage.
      iii.      It maintains high quality of service through its fast and prompt response
      iv.      It avoids and reduces fuel consumption since the generator is switch off immediately NEPA supply is restored.
      Moreover the size and capacity of the Unit will depend upon the load for which it will be used. The Unit is also portable, easy, convenient and safe to install.