• The Impact Of Production Planning And Control On Productivity In Nigerian Bottling Company

  • CHAPTER ONE -- [Total Page(s) 4]

    Page 2 of 4

    Previous   1 2 3 4    Next
    • 1.2    STATEMENT OF PROBLEM
      Most organization production processes are slow and the time given to complete a given task is always exceeded. This study intends to investigate and know the reasons behind slow productivity among the employees.
      And most time, the use of quantitative techniques in assigning a job in an organization is not properly maintained, there is  shortage of materials due to lack of good stock control. The scope and concept of production management is not fully known by some managers. The problem and solution of production planning and control will be discussed in this research work.
      Lastly, the study intends to know the problems associated with the activities of planning and control in relation to Coca-Cola production and suggest possible solutions.
      1.3    OBJECTIVES OF THE STUDY
                The following are the objectives of this study:
      i)            To assess the impact of Production Planning and control in Nigerian Bottling Company.
      ii)          To determine how effective planning and control enhance the productivity of Nigerian Bottling Company.
      iii)        To identify the strategy for enhancing the productivity of Nigerian Bottling Company.
      iv)         To assess adequate measures in controlling materials in Nigerian Bottling Company.
      1.4    STATEMENT OF HYPOTHESIS
      H0:    Effective Production Planning and Control does not enhance the productivity of Nigerian Bottling Company.
      H1:    Effective Production Planning and Control enhances the productivity of Nigerian Bottling Company productivity.
      1.5    SIGNIFICANCE OF THE STUDY
      The significance of this study cannot be overemphasized, because it helps managers and organizations to minimize the time and cost of production by revealing to a production manager when to assign task, which staff to assign the task, on which equipments or method to apply at any given situation or circumstances. It will also help Nigerian Bottling Company to maximize the efficiency of the operation and reduce production cost thereby maximizing profit through effective use of plant and machine sand by taking corrective measures. Nigerian Bottling Company will see its own lapses and improve on them so as to meet its own objective and also other organizations will take correction on their production system.
      1.6    SCOPE OF THE STUDY
      Production Planning and Control being a complex and dynamic concept has a wide area of coverage so it is clear that research of this nature cannot hold without problem. As such, this work is limited to the areas that are relevant to the problem under investigation that is effective production planning and control taking Nigerian Bottling Company into consideration.
      The major areas covered are the bottling line where the actual production scheduling and programming activities mostly take place. It covers other departments in relation to production because they are all interrelated.

  • CHAPTER ONE -- [Total Page(s) 4]

    Page 2 of 4

    Previous   1 2 3 4    Next