      6.0    CONCLUSION AND RECOMMENDATION
      6.1    CONCLUSION
      We sincerely appreciate the immense effort of the polytechnic authority for including this programme at the end of the course to help increase the knowledge and also the student scope of reasoning in terms of technological development
      This project allocated to students along with the course of completing the National Diploma Certificate (ND) is of vital and great importance because it improves the student’s knowledge to practical and technological development. The project allocated to us helps in the proper usage and handling of some machine which is manually and electrically operated. Also our drilling skill have been improved.
      With the help and maximum co-operation of our supervisor, we were just faced with minor problems during the construction of this project.
      With the experience gained, then we can improve on it and decide to produce it in mass quantity which can serve as a source of living and reduce unemployment rate in our country.
      6.2    RECOMMENDATION
      Early approval of the project is the most important factor to be considered by the polytechnic authority because the project might need huge sum of money which the students might not be able to get at once and also to avoid delayed of the project.
      Machines and tools that will be needed by the students for their project should be available in abundant to reduce the time being used on the construction of the project.
      Unstable power supply is another problem encountered during the construction of the project.
      If all these problems are looked into, we are sure that the best product will always emerge from this great institution, Kwara State Polytechnic.

  • CHAPTER SIX -- [Total Page(s) 1]

    Page 1 of 1

    • ABSRACT - [ Total Page(s): 1 ]ABSTRACT   Privacy and security are major essential human needs in various homes, offices e.t.c. Accessibility to adequate, durable, fashionable and affordable windows in our different buildings has been a problem to the society. Ability to have access to window of good quality and high durability of a price affordable to an average  Nigerian has been a problem.This project here aims at production of a durable aluminium window. The aluminium window was subjected to different test, it was found ... Continue reading---

         

      LIST OF FIGURES - [ Total Page(s): 1 ]LIST OF FIGUREFig1: Isometric view of the Aluminum window       Fig2: Isometric drawing of the complex window    ... Continue reading---

         

      TABLE OF CONTENTS - [ Total Page(s): 1 ]TABLE OF CONTENTTitle page  Approval page  Dedication   Acknowledgement         Abstract   Table of content      List of  figures   Nomenclature      CHAPTER ONE 1.0    Introduction      1.1    The Need for Aluminium Window      CHAPTER TWO2.0    Literature Review     2.1     Aims and Objectives  2.2    Types of Window Manufactures  2.2.1        Single Hung and Double Hung Window   2.2.2        Casement Window   2.2.3     Bow ... Continue reading---

         

      List of symbols/Abbreviations - [ Total Page(s): 1 ]NOMENCLATURE S/N      SYMBOLS     MEANING                            UNITS    1.          V                 volume                    m3        2.          M                 mass                        kg    3.          P                 density                    Kg/m3    4.          G                 acceleration due to ... Continue reading---

         

      CHAPTER ONE - [ Total Page(s): 1 ]CHAPTER ONE1.0    INTRODUCTION OF ALUMINIUM WINDOWWindows are possibly most complex and interesting element in residential design. Today’s energy efficient window can dramatically decrease the heating and cooling costs while increasing the occupant comfort and minimizing window surface condensation problem. In recent years there have been the advances in windows of both new construction and retrofits. High performance windows system may be considered as one of the key factors for reach ... Continue reading---

         

      CHAPTER TWO - [ Total Page(s): 2 ]CHAPTER TWO2.0    LITERATURE REVIEW In the past, windows were made by the use of wood as means of locking but it did not give a maximum security for life and properties and also it does not meet the wants of people.As time want on, technology came and they took it into consideration and decided to find alternative way to gives birth to aluminum windows, metal window e.t.c.These aluminum windows have been done in many ways with different designs irrespective to the wants of the prospective buy ... Continue reading---

         

      CHAPTER THREE - [ Total Page(s): 3 ]CHAPTER THREE3.0    SELECTION OF MATERIALAn engineer is always facing a lot of problems, when it comes to the aspect of material selection. An Engineer is always limited to the material at its vicinity particularly in Nigeria there is the need for them to improvise with the little materials.There are some parameters that an engineer must consider before choosing certain materials, some of which are listed below:1. Physical properties2. Strength 3. Fabricability4. Economic cost5. Chemical comp ... Continue reading---

         

      CHAPTER FOUR - [ Total Page(s): 5 ]CHAPTER FOUR4.0    DESIGN CALCULATION    By considering the factor considered for the selection of materials and dimensions of window fixture [i.e installation points], the calculation carried out was.4.1    MASS CALCULATION OF THE COMPONENTS    For the frame unit.Volume V1 of track of the frame = LxBxT ... Continue reading---

         

      CHAPTER FIVE - [ Total Page(s): 3 ]CHAPTER FIVE5.0    FABRICATION DETAILS5.1    CUTTING LIST OR MATERIAL LISTCUTTING LIST PER FRAME UNIT (ANGLE ALUMINUM)2” X 1” X 1200mm……………2 Off2” X 1” X 1178mm……………1 OffCUTTING LIST PER SLIDING UNIT2” X 1” X 517mm……………2 Off (top slide)2” X 1” X 517mm……………2 Off (bottom unit)2” X 1” X 1150mm………â ... Continue reading---

         

      REFRENCES - [ Total Page(s): 1 ]REFERENCESAbolarin Thomas (2007): Machine tools and technology”, ND II Mechanical engineering Handout, Kwara State Polytechnic, Ilorin, Nigeria (unpublished), pg 32.Chapman W. A .J (2000) “workshop technology’, 2nd edition Arnold London , pp 100-104Komolafe Abiola, Ajagbe M. Solomon (2011), “A project report on construction of aluminium frame, Pg 11, 22-24.Ojo A.I (1997),‘’Design and construction of a metal flush door’’, ND project report submi ... Continue reading---