• Effect Of Gas-oil-ratio On Oil Production

  • CHAPTER ONE -- [Total Page(s) 1]

    Page 1 of 1

    • CHAPTER 1
      INTRODUCTION
      Production optimization identifies the opportunities to increase production and reduce operating costs. The overall goal is to achieve the optimum profitability from the well. To achieve and maintain this, it is essential to evaluate and monitor different sections of the production system including, the wellbore sandface, reservoir, produced fluids, production equipment on surface and downhole. Several methods are being used for production optimization. The most common and widely used method is the system analysis approach commonly known as nodal analysis.
      Optimization of the wellbore is considered mainly during well completion stages. Tubing joints vary in length from 18 to 35 feet although the average tubing joint is approximately 30 feet. Tubing is available in a range of outer diameter sizes. The most common sizes are 2 3/8-in, 2 7/8-in, 3 1/2-in and 4 1/2-in. The API defines tubing as pipe from 1-in to 4 1/2-in OD. Larger diameter tubulars (4 1/2-in to 20-in) are being termed casing. (Schlumberger, 2001)
      The flow rate per well is the key parameter. It governs the number of wells that need to be drilled to achieve the optimum economic output of the field. The first parameter that needs to be considered in the tubing string selection is the nominal tubing diameter. The grades of steel and nominal weight are chosen based on the stress the tubing will have to withstand during production. Thirdly, depending on the how corrosive the existing and future effluents, the type of connection and the metallurgy are selected. In fact the different stages mentioned above overlap and sometimes make the choice of tubing a difficult job. In the determination of the nominal pipe diameter, the nominal diameter through the weight governs the inside through diameter of the pipe. The flows that can pass through it depend on the acceptable pressure losses but are also limited by two parameters: the maximum flow rate corresponding to the erosion velocity and the minimum flow rate necessary to achieve lifting of water or condensate. Tubings with diameter less than 2 7/8-in are mostly reserved for operations on well using concentric pipe and are termed macronic string. Note also that the space required by couplings of the tubing limits the nominal tubing diameter that can be run into the production casing. (Perrin, et al., 1999).

  • CHAPTER ONE -- [Total Page(s) 1]

    Page 1 of 1

    • ABSRACT - [ Total Page(s): 1 ]Maximum production from an oil well can be achieved through proper selection of tubing size. The selection of optimum tubing size must be evaluated when completing a well in any type of reservoir especially solution gas drive reservoir since there is likelihood of producing more gas as the reservoir pressure declines. The most widely used methods such as Tarner, Muskat and Tracy methods for predicting the performance of a solution gas drive reservoir were discussed and used to estimate the behav ... Continue reading---