-
MATERIAL BALANCE APPLICATION FOR BROWNFIELD DEVELOPMENT
-
You can get the complete material / full content @ a service support fee of ₦4,800.00(10-USDT) only
-
- Contributor: mr-chris
- engagements: 124
- Case No: 600311ip
- Request PDF:
-
-
ABSRACT - [ Total Page(s): 1 ]The need to re-develop one of the Brown fields located in the Niger Delta area of Nigeria was necessitated by the fact that there are still three undeveloped reservoirs in the field.A total of six stacked reservoirs, A100 to A600 (all oil bearing with associated gas) were penetrated between 8552 ftss and 10652 ftss by APV-1 well. Reservoir blocks A200 and A600 are the largest in the field accounting for 77% of the total field STOIIP. The well was completed with a Two String Multiple (TSM) on the two levels, with the short string producing from the A200 reservoir and the long string producing f
... Continue Reading
-
ABSRACT - [ Total Page(s): 1 ]The need to re-develop one of the Brown fields located in the Niger Delta area of Nigeria was necessitated by the fact that there are still three undeveloped reservoirs in the field.A total of six stacked reservoirs, A100 to A600 (all oil bearing with associated gas) were penetrated between 8552 ftss and 10652 ftss by APV-1 well. Reservoir blocks A200 and A600 are the largest in the field accounting for 77% of the total field STOIIP. The well was completed with a Two String Multiple (TSM) on the two levels, with the short string producing from the A200 reservoir and the long string producing f
... Continue Reading
-