-
MODELLING BUILDING CONSTRUCTION DURATIONS IN NIGERIA
-
You can get the complete material / full content @ a service support fee of ₦4,800.00(10-USDT) only
-
- Contributor: mr-chris
- engagements: 94
- Case No: 469724ip
- Request PDF:
-
-
ABSRACT - [ Total Page(s): 1 ]Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Niger
... Continue Reading
-
ABSRACT - [ Total Page(s): 1 ]Following widespread acceptance by researchers that the effects of qualitative/managerial construction time-influencing factors need to be considered in project scope-based construction time predicting models, several multivariate models combining project scope and qualitative/managerial factors have been developed. However, it has been shown in literature that the applicability of these models is clearly limited to the regions/countries where they were developed. This study was therefore aimed at developing a multivariate construction time predicting model that will be applicable to the Niger
... Continue Reading
-