• AN EMPIRICAL DETERMINATION OF LABOUR OUTPUT FOR WALL TILES


  • You can get the complete material / full content @ a service support fee of ₦4,800.00(10-USDT) only

    Download This Material Now !!

    • ABSRACT - [ Total Page(s): 1 ]Productivity is one of the important elements in construction planning and scheduling. However, construction industries in Nigeria are currently lacking in data with regard to productivity of the building’s construction activities especially in tiling works. The focus of the study was to use work study approach to empirically establish labour output for wall tiles for the Nigeria construction industry as well as to establish relationship between the influential factors and productivity. A total of 46 gang sizes of tilers for wall tiles 400mm x 300mm x 5mm, width > 300mm long side horizo ... Continue Reading

         

      CHAPTER ONE - [ Total Page(s): 1 ]CHAPTER ONEINTRODUCTION1.1              Background to the StudyA building is one of man’s basic requirements after food and can be used to determine the development of any nation. Research has shown that the cost of building a house is high and principally depends on cost of labour and materials (Maloney, 1983, Omange, 2000).Mohammed et al (2011) stated that the construction industry lagged due to insufficient research in the area of productivity. Methods for improving construction productivity to assist managers in identifying productivity barriers and offe ... Continue Reading