• EMPIRICAL DETERMINATION OF LABOUR OUTPUTS FOR BLOCK LAYING


  • You can get the complete material / full content @ a service support fee of ₦4,800.00(10-USDT) only

    Download This Material Now !!

    • ABSRACT - [ Total Page(s): 1 ]The source and nature of output constants used for preparation of construction estimates should be accurate and reliable for the client to have confidence on the prepared estimates. This research is focused on using time study approach to empirically determine the outputs of block laying work items inconstruction industry. The study reviewed BESMM3 and surveyed possible block work items in construction sites. Ten work items were selected from the identified block work items in BESMM3 and construction sites for Physical observations and output measurement. A total of 105 sites were observed in ... Continue Reading

         

      CHAPTER ONE - [ Total Page(s): 2 ] CHAPTER ONE1           INTRODUCTION1.1          Background of the StudyIn Nigeria, like most developing countries, the construction industry plays a dominant role in the economic activities of the country.The efficiency of the construction industry has been established to heavily rely on its level of productivity. Construction productivity is constantly declining over a decade due to the lack of standard productivity data base system and ignorance of impact of various factors influencing labo ... Continue Reading