-
DESIGHN AND INSTALLATION OF PHOTOVOLTAIC POWER SYSTEM
[A CASE STUDY OF A ROOM AND PARLOR SELF CONTAIN IN OKE-OSE, ILORIN KWARA STATE] -
You can get the complete material / full content @ a service support fee of ₦4,500.00(10-USDT) only
-
- Contributor: praise
- engagements: 210
- Case No: 426426pw
- Request PDF:
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTThis research work is based on the design and installation of photovoltaic power system. A room and parlor self contain at Ara village Kwara state was used as a case study. A total load of 740 watts a total wall hour capacity of 5840wh and total battery bank 1474.75Ah all was determined during the sizing of the apartment under study. The cost of using a diesel generator and electric from the public utilities (national grid). The result shows that after 1 year and 8 month, the cost of using diesel generator will be equal to the amount spent on photovoltaic system, also after 8 year 1m
... Continue Reading
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTThis research work is based on the design and installation of photovoltaic power system. A room and parlor self contain at Ara village Kwara state was used as a case study. A total load of 740 watts a total wall hour capacity of 5840wh and total battery bank 1474.75Ah all was determined during the sizing of the apartment under study. The cost of using a diesel generator and electric from the public utilities (national grid). The result shows that after 1 year and 8 month, the cost of using diesel generator will be equal to the amount spent on photovoltaic system, also after 8 year 1m
... Continue Reading
-