-
Route Survey Of The Stretch Of Road From Oriawo Along Ogbomoso Road, Oyo To School Of Science, Sabo Oyo Town, Atiba Local Government Area, Oyo State
-
-
-
TABLES OF CONTENTS
TITLE PAGE
CERTIFICATE
CERTIFICATION
DEDICATION
ACKNOWLEDGEMENTS
ABSTRACT
LIST OF FIGURE
LIST OF TABLES
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND TO THE STUDY
1.2 STATEMENT OF PROBLEMS
1.3.0 AIM AND OBJECTIVES OF THE STUDY
1.3.1 AIM
1.3.2 OBJECTIVES
1.5 SCOPE OF THE PROJECT
1.6 PERSONNEL
1.7 STUDY AREA
CHAPTER TWO
2.0 LITERATURE REVIEW
RECONNAISSANCE
PRELIMINARY SURVEY
LOCATION SURVEY
OFFICE LOCATION: -
CHAPTER THREE
3.0 METHODOLOGY
3.1 RECONNAISSANCE
3.1.1 OFFICE PLANNING
3.1.2 FIELD RECONNAISSANCE
3.2 DATA ACQUISITION
3.2.1 EQUIPMENT USED
3.2.2 TEST OF INSTRUMENT
3.2.2.2 LEVEL INSTRUMENT TEST (TWO PEG TEST)
3.2.3 CONTROL CHECK
3.2.3.1 SELECTION OF STATIONS
3.2.3.2 MONUMENTATION
3.2.4 FIELD OBSEVATION
3.2.4.1 ANGULAR MEASUREMENT
3.2.4.2 LINEAR MEASUREMENTS
3.2.4.3 LEVELING
3.2.4.5 DETAILING
CHAPTER FOUR
4.0 DATA PROCESSING AND RESULT ANALYSIS
4.1 FIELD BOOKS REDUCTIONS
4.1.1 HORIZONTAL ANGLE REDUCTION
4.1.2 VERTICAL ANGLE REDUCTION
4.1.3 LINEAR MEASUREMENT REDUCTION
4.2.1 FORWARD COMPUTATION
4.2.1.1 BEARING REDUCTION
4.2.1.2 CORRECTION TO BEARING
4.2.1.3 COORDINATES REDUCTION
4.2.1.4 COORDINATES ADJUSTMENTS
4.2.2 BACK COMPUTATION
4.2.3 LEVELING COMPUTATION AND ADJUSTMENTS
4.2.3.1 LEVELING ADJUSTMENT
4.2.4 ACCURACY
4.2.4.1 ANGULAR ACCURACY
4.2.4.2 LEVELING ACCURACY
4.2.4.3 LINEAR ACCURACY
4.3 RESULT ANALYSIS
4.4 EXTRACT OF RESULT
4.6 INFORMATION PRESENTATION (ANALOG AND DIGITAL)
4.6.1 PLAN PRODUCTION
4.6.2 MANUAL PLOTTING
4.6.3 DIGITAL PLOTTING
CHAPTER FIVE
5.0 SUMMARY, RECOMMENDATION AND CONCLUSION
5.1 SUMMARY
5.2 PROBLEMS ENCOUNTERED
5.3 CONCLUSION
5.4 RECOMMENDATIONS
REFERENCES
APPENDICES
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---
TABLE OF CONTENTS -- [Total Page(s) 1]
Page 1 of 1
TABLE OF CONTENTS -- [Total Page(s) 1]
Page 1 of 1