    • 1.4 PROJECT SPECIFICATIONS
      The following are the specification to be ascertained in the project:
      (i)    Traverse must commence on three coordinated (known) controls and closed on another set of three coordinated controls which must be confirmed undisturbed by necessary measurement (control checks).
      (ii)    Third order theodolite traverse must be run along the route on all turning points at one zero observation and the angular difference  from both faces should not be more than thirty seconds (30"), the angular misclosure is determined by 30"√n,  
      Where ‘n’ is the total number of station observed.
      (iii)    Establishing traverse points by using pegs together with nails and bottle corks. 
      (iv)    Spirit leveling must commence on a known benchmark and closed back on another known benchmark. Formulae for its misclosure are ±24mm√k, where ‘k’ is the total distance covered in kilometers.
      (v)    Leveling must be observed at every 25m intervals on the centre line and at 5m intervals on both sides of the centre line for the cross sectioning. Edges of drainage at both sides should be heightened.
      (vi)    Fixing of relevant features to enhance assessment and necessary composition for good interpretation of plan.
      (vii)    Setting out curve by using deflection angle method within third other survey.
      (viii)    The accuracy of the project must fall within the order of the project.
      1.5 SCOPE OF THE PROJECT
      The entire project covered the following:-
      (i)    Reconnaissance (both office planning and field reconnaissance).
      (ii)    Data acquisition:
      (a) Selection of stations.
      (b) Traverse  angular observation and data recording.
      (c) Linear measurement with the aid of Mato NTS352R total station.
      (d) Spirit leveling of traverse centre line and adjacent sides (longitudinal or    profile and cross sectioning).
      (e) Fixing of details by tacheometry method.
      (iii)Computations to determine:
      (a) Horizontal coordinates (i.e. x and y coordinates)
      (b) Vertical coordinates (i.e. z coordinates) by level reduction.
      (c) Setting out angles and distance for the curve.
      (iii)    Data analysis i.e. comparing result obtained with the required accuracy.
      (iv)    Data presentation :
      (a) Production of horizontal alignment (i.e. plan showing existing features and the propose route).
      (b) Production of longitudinal section plan
      (c) Production of cross section plan
      (d)Project report writing: - This involves writing of detail report in connection with entire project done in conformity with the outline given by the project supervisor.
      1.6    PERSONNEL
      The underlisted names are the personnel that participated in the execution of this project. They are:
      1.    ABDUL RAHEEM SADIAT FUNKE    HND/16/SGI/FT/001 (writer)
      2.    ADENIYI ADEBOWALE OLUMIDE    HND/16/SGI/FT/025
      3.    AWONIRAN SAKIRU OPEYEMI        HND/16/SGI/FT/015
      4.    HAMMED KAZEEM BOLAJI        HND/16/SGI/FT/018      
      1.7    STUDY AREA
      The project site is the route from Oyun to olorun village moro Local Government area Ilorin, Kwara State. It cover approximately 3.km extent of land.
  • CHAPTER ONE -- [Total Page(s) 3]

    Page 2 of 3

    Previous   1 2 3    Next
    • ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---

         

      APPENDIX A - [ Total Page(s): 1 ]FEDERAL SCHOOL OF SURVEYING, OYO                                                                                                                                    FinalProject On Route Surveying                                                                                        ... Continue reading---

         

      LIST OF TABLES - [ Total Page(s): 1 ]LIST OF TABLESTable 3.1: Coordinates of existing ground controls used Table 3.2 Collimation test Table 3.3: Initial control check observation.  Table 3.4: Back computation of initial control used  Closing control check observation. Back computation of initial control used Table 4.1 Sample of Horizontal angle reduction Table 4.1 Back computation of traverse pegs ... Continue reading---

         

      LIST OF FIGURES - [ Total Page(s): 1 ]LIST OF FIGUREFigure 1.1: Study Area diagram    Error! Bookmark not defined.Figure 3.1 Recce Diagram Figure 3.2: Leveling instrument set up mid-way (first set-up) Figure 3.3: Leveling instrument set up( second set up) Figure 3.4 Initial control check observations  Figure 3.6 A typical monument used Figure 3.7: Longitudinal sections leveling. Figure 3.8: Cross-sectional leveling. Fig.: 3.9 – Illustration of detailing by tachometer method ... Continue reading---

         

      TABLE OF CONTENTS - [ Total Page(s): 1 ]TABLES OF CONTENTSTITLE PAGE CERTIFICATE CERTIFICATION DEDICATION  ACKNOWLEDGEMENTS ABSTRACT  LIST OF FIGURE LIST OF TABLES CHAPTER ONE 1.0 INTRODUCTION 1.1 BACKGROUND TO THE STUDY   1.2 STATEMENT OF PROBLEMS  1.3.0 AIM AND OBJECTIVES OF THE STUDY     1.3.1 AIM    1.3.2 OBJECTIVES  1.5 SCOPE OF THE PROJECT 1.6    PERSONNEL   1.7    STUDY AREA CHAPTER TWO   2.0    LITERATURE REVIEW  RECONNAISSANCE PRELIMINARY SURVEY  LOCATION SURVEY  OFFICE LOCATION: -  CHAPTER THREE ... Continue reading---

         

      CHAPTER TWO - [ Total Page(s): 3 ]Traverse is a sequence of connected straight lines whose direction and distances have been measured. Traverse is also the process of connecting series of lines with known bearings and distances. It is subdivided into first order for precise measurement and second order for the establishment of secondary controls while the third order is meant for survey of tertiary and topographical features.Basak (2000) explained leveling as the art of determining the relative vertical heights of different poin ... Continue reading---

         

      CHAPTER THREE - [ Total Page(s): 9 ]The table below also shows the back computation of the first set of control used.From the above two tables:The Observed angle at FSS2/GPS/120 (between FSS2/GPS/121 & FSS2/GPS/118) =120º 14’ 25”Forward bearing from FSS2/GPS/120to FSS2/GPS/118 =358º 09’ 34.64”Back bearing from FSS2/GPS/120 to FSS2/GPS/121 =237º55’15.9”Computed Angle betweenFSS2/GPS/121&FSS2/GPS/118 = Forward bearing-Back bearing =358º09’ 34.64”- 237º 55’ 15. ... Continue reading---

         

      CHAPTER FOUR - [ Total Page(s): 5 ]CHAPTER FOUR4.0      DATA PROCESSING AND RESULT ANALYSIS    This involved calculations that are based on acquired data from the field observation to determine locations, direction, height, distance and area etc. some specific formulae were employed for each data set depending on the desired end products and great degree of precision was required.4.1    FIELD BOOKS REDUCTIONS    Every field book was reduced to generate the final data set to be used in the final computation4.1.1   ... Continue reading---

         

      CHAPTER FIVE - [ Total Page(s): 1 ]CHAPTER FIVE5.0    SUMMARY, RECOMMENDATION AND CONCLUSION5.1     SUMMARYThe reconnaissance, which was the main planning, was carefully carried out because of its importance to good execution of any survey project or work. Having carried out the reconnaissance, six (6) second order control stations were located and used as connection along the given route. The total number of nineteen (19) stations excluding the controls where the angles and distances were determine by a closed traverse met ... Continue reading---

         

      REFRENCES - [ Total Page(s): 1 ]REFERENCESBANNISTER AND RAYMOND (1977) Surveying: 4th Ed, Pitman Publishing Ltd, London. Pg. 205BASAK, N.N (2000): Surveying and leveling, Tata Mchraw Hill publishing company Delhi, p.173, Pp.439-444.BRINKER, R. C. AND MINICK, P. R. (1987): Elementary Surveying, 6th Edition IEP- A     Donnseley New York. Pg. 3CLARK, DAVID (1972): Pane and Geodetic surveying for Engineers, 6th edition, vol.1, London: Constable and Co. Limited, pg.144    IDEMUDIA, I.M. (2007):”Right of Way and Acquisi ... Continue reading---