3.0 METHODOLOGY
Different survey methods and techniques were employed in the execution of the route survey project. The methods adopted comprises of the following; reconnaissance, location of controls and checks, selection of stations, test of instrument, data acquisition, which include theodolite traversing, leveling,(profile and cross section) detailing by the use of total station(traverse method), curve designation, data processing, and information presentation.
3.1 RECONNAISSANCE
Reconnaissance is the initial and one of the most important stages in surveying. This is the actual visitation to the particular area to be surveyed, in order to obtain an overall picture of the area before any type of survey work is undertaken. Reconnaissance survey helps to minimize any delays or changes in the observing schedule. There may be unnecessary loss of workdays if one goes to the project site with inadequate and insufficient information, which is needed to arrange for logistics and description for locating survey marks. But for this project; it was carried out in two ways namely:
i. Office reconnaissance
ii. Field reconnaissance
3.1.1 OFFICE PLANNING
During the office reconnaissance, the coordinates of the control Points to be used for the survey work were collected from SIWES and Practical Unit, Federal School of Surveying, Oyo. Also collected was the sketch map of the project area, thus knowing the latitudes and longitudes of the place. The decision on the best way to carry out the project was made after receiving instruction from my supervisor. The table below shows the coordinates of the control beacons used.
3.1.2 FIELD RECONNAISSANCE
During the field reconnaissance, the project site was visited in order to have an overall picture of the site i.e. to know how the terrain of the project site look like before the commencement of actual work.
The following activities were carried out during the field recce:
i. Location of the existing controls used for this project.
ii. Establishment of boundary marks.
iii. Ensuring inter-visibility and accessibility between boundary marks
iv. Sketching of the recce diagram (fig 3.1)
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---