Route Survey Of The Stretch Of Road From Oriawo Along Ogbomoso Road, Oyo To School Of Science, Sabo Oyo Town, Atiba Local Government Area, Oyo State
-
-
-
3.2.3 CONTROL CHECK
The essence of carrying out this operation is to ascertain the reliability of the controls. This check involves both the angular and linear measurement using the Theodolite Instrument.
From the diagram below, the instrument was setup on FSS2/GPS/120 and the back and fore targets was set up on FSS2/GPS/121 and FSS2/GPS/118 respectively. All temporary adjustments were carried out (centering, leveling, and focusing). The telescope of the instrument was turned to face back station target and horizontal circle reading was recorded.
The instrument was turned clockwise to fore station target and bisected with telescope on the same face and reading was recorded. Thereafter, the face of theodolite was changed by transiting the telescope and the fore target was bisected. The back target was also re-bisected at face right and also the horizontal circle reading was recorded.This is the control check to which the job was tied. The Theodolite and EDM reading as well as the angle reduction were shown in the table below:
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---