The table below also shows the back computation of the first set of control used.
From the above two tables:
The Observed angle at FSS2/GPS/120 (between FSS2/GPS/121 & FSS2/GPS/118) =120º 14’ 25â€
Forward bearing from FSS2/GPS/120to FSS2/GPS/118 =358º 09’ 34.64â€
Back bearing from FSS2/GPS/120 to FSS2/GPS/121 =237º55’15.9â€
Computed Angle betweenFSS2/GPS/121&FSS2/GPS/118 = Forward bearing-Back bearing
=358º09’ 34.64â€- 237º 55’ 15.9â€
= 120º14’ 18.6â€
Difference between the two angles =11.4â€
Measured distance from FSS2/GPS/120 to FSS2/GPS/118 = 93.473m
Computed distance from FSS2/GPS/120 to FSS2/GPS/118 = 93.476
Difference between the two distances =0.003
From the above two tables:
The Observed angle at FSS2/GPS/03 (between FSS2/GPS/04 & FSS2/GPS/02) =194º19’ 20’’
Forward bearing from FSS2/GPS/04 to FSS2/GPS03 =248º26’ 50.06â€
Back bearing from FSS2/GPS/03 to FSS2/GPS/02 =153º47’ 58.8â€
Computed Angle betweenFSS2/GPS/04 & FSS2/GPS/02 = Forward bearing-Back bearing
=153º47’58.8â€- 248º26’ 50.06â€Â¬+360º
= 265º 21’ 8.74â€
Difference between the two angles =11.26â€
Measured distance from FSS2/GPS/03 to FSS2/GPS/04=173.002m
Computed distance from FSS2/GPS/03 to FSS2/GPS/04 = 173.983m
Difference between the two distances = 0.019m
From the result above obtained, it was concluded that the controls were in their normal position.
-
-
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]ABSTRACTTheproject was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specificationsTheodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to pro ... Continue reading---