1.3 SIGNIFICANT OF THE PROJECT
Engineers need a topographical survey to see the surface of elevation of the land and whether dirt must be inserted or removed to adjust the property grade
Architect could use the survey for construction of 3D plot of their design this plot can be submitted before talking with decision makers for approval of a building site is transited by significant topographical challenges such as steep grades, existing main made structure’s or other problematic conditions a topographical inspection should be used to ensure that the design proposed will work under these conditions before construction start.
Government agencies also users topographical surveys to produce employment evaluate existing infrastmeture, carry out required revisions and consider environmental projects and emplace mat the construction and zooming regulation.
1.4 LIMITATION OF THE STUDY
Time is a common basic for the land surveyor. But talking about time management or organization problem, instead the vast amount of time some owners hold there properties can precut challenge for the surveyor. In short, a property that has been in a family for generation has undergone change that are not reflected in the original deeds and streams change channels the physical evidence upholding the legal land transcoption has simply vanished into the most of time on top of vanished makers. Accommodation for neighbors and other understandings that were never formally documented can blur the property lines, sometimes catching the current owners ny surprise. Slope of land that have long been used by overcome around are found to be private property or a fence been placed along an uncovered boundary but never corrected new owner comes along and the first survey in decades highlights the surveyors applied as much art as science in defining the boundaries of mutigenerational properties
Weather and Seasonal Changes; weather and seasonal changes of the season present another challenge. The perfect environment for a survey is really to be found. Land surveyors could wish that all the tics were bare have this ground clear of leaves, with comfortable transperature and the night light you client often have this luxury. Bright sunlight creates deep shadow which masks features. They make surface wet and even when the rain stops water drop from the trees. The wind that comes with the rain is difficult to walk while carrying expensive equipment cold and freeze the surveyor and the lubrication required for the instruments to operate smoothly many of today’s electronics tools have don’t always match what mother nature makes available.
1.5 SCOPE OF THE STUDY
This study aim of carrying out topographical survey at Government Technical Collage Idah, Kogi State. However it out to achieve the following objectives reconstitute a sight synthesized image of the ground at the Government technical collage idah, Kogi state. Determine a trajectory of a flight of the ground at the government technical collage idah, kogi state. Calculate the surface area of government technical collage have the topographical profile of Government Technical Collage Idah, Kogi State.
1.6 STUDY AREA
The study area is Government Technical Collage Idah, Kogi State.
1.7 PROJECT ORDER AND SPECIFICATION
Field survey notes are the records of work done on the field. They contain the complete graphic table or winters (or combination thereof) survey records
1.8 LEVEL PF PARTICIPATION
This is the stage where I and the other member of the of the group planned on how the survey projects will be done and by sharing and showing everybody’s position and contribution to be made in the course of the project to selecting and testing instrument and other equipment to be used on the field during this projection down to the creation of works office recce.
-
-
-
ABSRACT - [ Total Page(s): 1 ]This project aimed purposely at the production of topographic plan of Government technical college idah Kogi State. The following surveying methods are carried out to achieve this project. A reconnaissance surveying of the area to be survey was carried out before other topographical surveying method was carried out total station traversing for coordinating of the station was carried out leveling which is purposely aimed at determining the deference in spot height after which the topographical ma ... Continue reading---
-
ABSRACT - [ Total Page(s): 1 ]This project aimed purposely at the production of topographic plan of Government technical college idah Kogi State. The following surveying methods are carried out to achieve this project. A reconnaissance surveying of the area to be survey was carried out before other topographical surveying method was carried out total station traversing for coordinating of the station was carried out leveling which is purposely aimed at determining the deference in spot height after which the topographical ma ... Continue reading---